| 1 | Industrial Warehouse Specialist | Storage, logistics, and distribution buildings | 15–40 m | 6–12 m | Rigid steel portal frames with secondary purlins and girts | Insulated sandwich panels or profiled steel sheets | 4–8 weeks after approved drawings | GB, EN, ASTM, or project-specific codes | Factories, fulfillment centers, and general warehouses |
| 2 | Agricultural Building Specialist | Livestock shelters, barns, and farm storage | 10–30 m | 4.5–9 m | Light portal frames with bracing and corrosion-protected members | Galvanized steel sheets, ventilated cladding, or insulated panels | 3–7 weeks after approved drawings | Agricultural, wind, snow, and corrosion requirements | Dairy barns, poultry houses, machinery sheds, and grain storage |
| 3 | Cold Storage Building Specialist | Temperature-controlled warehouses | 15–35 m | 6–14 m | Steel portal frames designed for insulated envelope loads | PU or PIR insulated panels with sealed joints and vapor control | 6–10 weeks after approved drawings | Food safety, thermal insulation, fire, and structural codes | Food distribution, pharmaceutical storage, and refrigerated logistics |
| 4 | Commercial and Retail Building Specialist | Showrooms, retail halls, and service buildings | 12–30 m | 4.5–10 m | Steel frames combined with architectural facade systems | Insulated panels, curtain wall sections, metal cladding, or masonry infill | 5–9 weeks after approved drawings | Commercial building, fire, accessibility, and energy codes | Retail outlets, exhibition halls, dealerships, and workshops |
| 5 | High-Bay Industrial Building Specialist | Production facilities with cranes or tall equipment | 20–45 m | 9–20 m | Heavy portal frames, crane runway beams, and reinforced connections | Insulated metal panels or double-layer steel cladding | 8–14 weeks after approved drawings | Structural steel, crane, fatigue, seismic, and fire codes | Manufacturing plants, assembly halls, and engineering workshops |
| 6 | Modular Steel Building Specialist | Relocatable and rapidly assembled buildings | 6–18 m | 2.8–6 m | Cold-formed steel modules or volumetric steel frames | Insulated sandwich panels, fiber cement boards, or composite facades | 3–8 weeks after approved drawings | Modular construction, fire, transport, and local building codes | Site offices, classrooms, clinics, dormitories, and temporary facilities |
| 7 | Sports and Large-Span Building Specialist | Indoor courts, arenas, and community halls | 25–70 m | 8–18 m | Long-span trusses, space frames, or tapered steel frames | Insulated roof panels, metal wall panels, and daylight systems | 8–16 weeks after approved drawings | Long-span, wind, snow, crowd-load, and fire requirements | Gymnasiums, sports centers, event halls, and passenger terminals |
| 8 | Mining and Heavy-Duty Building Specialist | Processing, maintenance, and equipment shelters | 20–50 m | 8–18 m | Heavy structural steel frames with impact and corrosion allowances | Steel plate, profiled sheets, insulated panels, or specialized cladding | 8–16 weeks after approved drawings | Industrial, hazardous-area, seismic, and durability requirements | Mining facilities, maintenance bays, processing plants, and workshops |
| 9 | Clean and Controlled-Environment Building Specialist | Low-contamination production spaces | 10–25 m | 3.5–8 m | Steel frame with coordinated service zones and suspended ceilings | Flush insulated panels with sealed, cleanable surfaces | 7–14 weeks after approved drawings | Structural, fire, hygiene, environmental, and cleanroom requirements | Electronics, medical products, laboratories, and food processing |
| 10 | Export Project and Design-Build Specialist | Overseas industrial and commercial projects | 12–45 m | 5–15 m | Engineered portal frames or fabricated structural steel packages | Insulated panels, profiled steel sheets, and locally sourced finishing systems | 6–14 weeks after approved drawings | GB, EN, ASTM, AS, or destination-country codes | Turnkey factories, warehouses, workshops, and remote-site buildings |