| 1 | Airflow and Coverage | Match the fan’s airflow, air-throw distance, and coverage area to the room size, ceiling height, occupancy, and heat load. | Use-case first Compare airflow in m³/h or CFM, not only motor power. For large spaces, confirm the number and placement of fans through a layout review. | Performance curve, airflow test data, dimensional drawing, and a proposed fan layout. | Insufficient air movement, uneven comfort, excessive energy use, or unnecessary equipment purchases. |
| 2 | Electrical Compatibility | Verify voltage, frequency, phase, rated current, motor type, control method, and local electrical-code requirements. | Country-specific The nameplate rating must match the installation site. Check whether single-phase or three-phase power is available. | Electrical nameplate, wiring diagram, motor data sheet, conformity documents, and control-panel specifications. | Motor damage, nuisance tripping, unsafe wiring, delayed commissioning, or non-compliance with local regulations. |
| 3 | Installation Conditions | Confirm mounting method, ceiling structure, clearance, access for service, environmental conditions, and required lifting equipment. | Site survey Obtain structural approval before installation. Confirm whether the location is dusty, humid, corrosive, outdoor, or exposed to high temperatures. | Installation manual, mounting details, load requirements, clearance requirements, and site-specific installation checklist. | Vibration, falling equipment, poor performance, corrosion, difficult maintenance, or project delays. |
| 4 | Noise and Workplace Comfort | Review sound pressure or sound power data and determine whether the fan is suitable for offices, retail areas, workshops, warehouses, or public spaces. | Measure correctly Compare noise data using the same measurement conditions and distance. Consider background noise and the required working environment. | Noise test report, measurement method, operating speed, and recommended installation distance. | Worker complaints, reduced productivity, failed acceptance testing, or unsuitable operation in noise-sensitive areas. |
| 5 | Energy Efficiency and Controls | Evaluate motor efficiency, operating speed, control options, standby consumption, and compatibility with building-management systems. | Total operating cost Request power consumption at the intended operating point. Variable-speed control can reduce energy use when full airflow is not required. | Power-consumption data, efficiency information, controller specifications, communication protocol details, and control wiring diagram. | Higher electricity costs, limited controllability, incompatible automation systems, or premature control-equipment failure. |
| 6 | Safety and Protection Features | Check guards, emergency-stop integration, overload protection, thermal protection, balancing, anti-drop measures, and safe access procedures. | Documented safety Safety features should be identified in the technical documentation and inspected during commissioning. | Safety test records, risk assessment, installation instructions, inspection checklist, and applicable conformity declarations. | Personal injury, equipment damage, insurance issues, regulatory problems, or production interruption. |
| 7 | Maintenance Requirements | Confirm cleaning frequency, bearing or motor service requirements, fastener checks, belt requirements if applicable, and replacement-part access. | Plan before purchase Prefer clearly documented preventive-maintenance tasks and service intervals. Maintenance intervals depend on operating hours and site conditions. | Maintenance schedule, parts list, exploded diagram, lubrication instructions, troubleshooting guide, and recommended tools. | Reduced airflow, vibration, unplanned downtime, shorter service life, and higher maintenance costs. |
| 8 | Warranty Scope and Duration | Clarify warranty duration, coverage for motor and controls, exclusions, labor coverage, transport responsibility, and claim procedures. | Read the terms The warranty should state the start date, operating conditions, required installation standards, and actions that may void coverage. | Written warranty policy, warranty certificate, exclusions, service-level terms, and required commissioning records. | Unexpected repair costs, rejected claims, disputes over responsibility, or extended downtime. |
| 9 | After-Sales and Technical Support | Assess response channels, service coverage in the destination country, remote troubleshooting, local technicians, and escalation procedures. | Support readiness Confirm support hours, response targets, language availability, spare-parts ordering procedures, and remote diagnostic capability. | Support contact list, service-level agreement, escalation flow, technician coverage map, and remote-support procedure. | Longer downtime, unclear communication, repeated service visits, and difficulty resolving commissioning issues. |
| 10 | Spare Parts and Total Cost of Ownership | Calculate purchase, freight, duties, installation, energy, maintenance, replacement parts, and end-of-life costs over the planned service period. | Compare the full lifecycle Confirm standard spare-part availability, estimated lead times, packaging requirements, and delivery terms such as Incoterms. | Detailed quotation, parts-price list, lead-time statement, packing specifications, shipping terms, and lifecycle-cost estimate. | Budget overruns, customs delays, unavailable parts, higher operating costs, or premature replacement. |